This is my one real problem area with the site ....... the mud pit. This area is the remnants of a gully that washed out from surface runoff. The topsoil is pretty thick around here and the area stays fairly wet ..... partly as result of the time of year it is and the fact that I didn't remove more trees on the south side of the pad. The drainage isn't real good here at the moment - alot of topsoil got built up on the road back to the rear of the property where the stump pile is. I'll need to cut a ditch beside the road to get better runoff. The current plan is to locate the building as far north on the pad as possible, and try to avoid this area as much as we can, excavate any topsoil from this are and repack it with clay obtained from grading the pad.