Redneck in training
Elite Member
When I lay tiles or stones I lay them in few inches of dry premix concrete, broom it in the cracks and when done just water it. The concrete will cure to less strength than when mixed with water but strong enough to withstand normal traffic and also prevents weeds in cracks. This method works well when the underlaying material is well settled or compacted.