Since I'm in a posting mood I thought I would get your opinions on post hole digger. I will be putting in a new deck behind our house this fall and will need to put in the concrete footers. I'll probably buy those tubes and stick down 24" or whatever the frost line is. This will be in TN clay and don't want to do it with a manual digger. Probably no more than 10 holes total. I realise I could rent a gas power 1 or 2 man phd but thought a 3 pt would be better (means less work). Does anyone have a recommendation for the 2210?