Was busy most of morning with car stuff. Getting front end alignment on one of my classics. This afternoon I got my new dump trailer dirty and scratched for the first time. Made a few trips to the stone and gravel pit and brought home 4 yards of bank run and another 4 yards of gravel mix for a low spot in the driveway by one of the garages. Still have to get another 4-6 yards tomorrow to come out a little further. The right side (close to the garage only needed a few inches. The left side now has about a foot of bank run then gravel on top. When completed I'll have a place to park the trailers on level ground.