What do you think?

   / What do you think? #11  
Just had my whole driveway paved a month ago and got 4 estimates. Maybe different type specs get used in different regions but in my area all specified the following on their estimates:

Regrade area - add a base of 21-A crush run stone fine grade, compact and treat with weed killer. Pave with 2.5 inches of 9.5.

Two of the contractors said whether I chose them or not, in a year I should get it seal coated and then every 4 to 5 years thereafter. Doing so supposedly will keep it from deteriorating and last much longer.
 
Last edited:

Tractor & Equipment Auctions

2018 VOLVO VNL TANDEM AXLE DAY CAB (A59575)
2018 VOLVO VNL...
SHOP MADE MANIFOLD TRAILER (A58214)
SHOP MADE MANIFOLD...
207272 (A52708)
207272 (A52708)
1996 Freightliner FLD112SD T/A Dump Truck (A55852)
1996 Freightliner...
SCAN TO RECEIVE TEXT UPDATES (A60429)
SCAN TO RECEIVE...
2025 GPS Trailer (A56857)
2025 GPS Trailer...
 
Top