Builder - you need to come up this way and work, you would find tons of work after a year or two. They way you describe building things always sounds right to me.
As far as concrete in my building goes, the monkeys that did my slab in my pole building swore up and down that I didn't need control joints cut in my slab (28x40). I made them do it (I told them they didn't have to if they would sign an agreement to come back and fix all the cracks). I had slate fill, and had a 30 Ton roller compact it after the dozer had spread the fill and packed it, and it still settled some. I put 2b gravel over the slate fill and then had a concrete crew come in. My tractor with loader and whatever attachment park on it all the time. I have some cracks, but it still beats dirt.
As far as concrete in my building goes, the monkeys that did my slab in my pole building swore up and down that I didn't need control joints cut in my slab (28x40). I made them do it (I told them they didn't have to if they would sign an agreement to come back and fix all the cracks). I had slate fill, and had a 30 Ton roller compact it after the dozer had spread the fill and packed it, and it still settled some. I put 2b gravel over the slate fill and then had a concrete crew come in. My tractor with loader and whatever attachment park on it all the time. I have some cracks, but it still beats dirt.