   / Building a covered work area with a 40' span, will this work? #51  
The main reason for the availability right now is that the oil patch in South Texas is essentially shut down because of low oil prices. That's put a LOT of white and yellow band drill pipe on the local market for as little as $26 for a 31' joint. Yellow band pipe is still 85% or more of it's original thickness so it'll take a LONG time to rust out.

That said, I hear what you're saying and with orange or red band, it is definitely a serious concern. I'm not saying I disagree with you, I'm just thinking on the keyboard.

I never heard of the color band rating for drill stem pipe. I'm seeing 2 3/8s pipe for $20 a joint and 2 7/8s for $30 a joint with 4 1/2 going for $2.50 a foot. None of the ads I've saved mention a color of any kind. I'm wanting it for an 8 foot deer fence around my land and while I want to save money, I also want to do it once and move on to other things.

What are all the colors and what do they mean?
 
   / Building a covered work area with a 40' span, will this work?
  • Thread Starter
#52  
   / Building a covered work area with a 40' span, will this work? #53  
Thank you!!!
 

Tractor & Equipment Auctions

2012 JOHN DERE 310K BACKHOE (A51406)
2012 JOHN DERE...
Toro Workman Low Profile Spray system 200 (A50322)
Toro Workman Low...
2008 DRAGON 150 BBL ALUMINUM VACUUM TRAILER (A53843)
2008 DRAGON 150...
2018 WACKER NEUSON RTSC3 ROLLER (A53426)
2018 WACKER NEUSON...
2011 INTERNATIONAL DURASTAR 4400 (A53843)
2011 INTERNATIONAL...
Scag STT61V 61in Zero Turn Mower (A51694)
Scag STT61V 61in...
 
Top