Building a covered work area with a 40' span, will this work?

   / Building a covered work area with a 40' span, will this work? #51  
The main reason for the availability right now is that the oil patch in South Texas is essentially shut down because of low oil prices. That's put a LOT of white and yellow band drill pipe on the local market for as little as $26 for a 31' joint. Yellow band pipe is still 85% or more of it's original thickness so it'll take a LONG time to rust out.

That said, I hear what you're saying and with orange or red band, it is definitely a serious concern. I'm not saying I disagree with you, I'm just thinking on the keyboard.

I never heard of the color band rating for drill stem pipe. I'm seeing 2 3/8s pipe for $20 a joint and 2 7/8s for $30 a joint with 4 1/2 going for $2.50 a foot. None of the ads I've saved mention a color of any kind. I'm wanting it for an 8 foot deer fence around my land and while I want to save money, I also want to do it once and move on to other things.

What are all the colors and what do they mean?
 
   / Building a covered work area with a 40' span, will this work?
  • Thread Starter
#52  
   / Building a covered work area with a 40' span, will this work? #53  
Thank you!!!
 

Tractor & Equipment Auctions

(INOP) 2017 FORD F550 XL SERVICE TRUCK (A51406)
(INOP) 2017 FORD...
Galvanized Steel Fence 10ft x 7ft (A55758)
Galvanized Steel...
UNUSED FUTURE CLG72 - 72" HYD CURVED LOG GRABBER (A54757)
UNUSED FUTURE...
Box of Cable (A47477)
Box of Cable (A47477)
KIVEL TRAILER MOVER ATTACHMENT (A55787)
KIVEL TRAILER...
2013 East Manufacturing 45ft T/A Walking Floor Trailer (A53422)
2013 East...
 
Top