Building a covered work area with a 40' span, will this work?

   / Building a covered work area with a 40' span, will this work? #51  
The main reason for the availability right now is that the oil patch in South Texas is essentially shut down because of low oil prices. That's put a LOT of white and yellow band drill pipe on the local market for as little as $26 for a 31' joint. Yellow band pipe is still 85% or more of it's original thickness so it'll take a LONG time to rust out.

That said, I hear what you're saying and with orange or red band, it is definitely a serious concern. I'm not saying I disagree with you, I'm just thinking on the keyboard.

I never heard of the color band rating for drill stem pipe. I'm seeing 2 3/8s pipe for $20 a joint and 2 7/8s for $30 a joint with 4 1/2 going for $2.50 a foot. None of the ads I've saved mention a color of any kind. I'm wanting it for an 8 foot deer fence around my land and while I want to save money, I also want to do it once and move on to other things.

What are all the colors and what do they mean?
 
   / Building a covered work area with a 40' span, will this work?
  • Thread Starter
#52  
   / Building a covered work area with a 40' span, will this work? #53  
Thank you!!!
 

Tractor & Equipment Auctions

Quick Attach Skid Steer Quick Claw Grapple Industrial Grapple Rake (A53473)
Quick Attach Skid...
2010 Ford Edge SE SUV (A51694)
2010 Ford Edge SE...
2005 John Deere 310G 4x4 Loader Backhoe (A53421)
2005 John Deere...
UNUSED FUTURE FT-S13 ELECTRIC MASSAGE CHAIR (A54757)
UNUSED FUTURE...
BUNDLE OF 82" X 49" DIAMOND PLATE SHEET METAL (A54756)
BUNDLE OF 82" X...
(4) UNUSED LANDHONOR PINS (A54757)
(4) UNUSED...
 
Top