The main reason for the availability right now is that the oil patch in South Texas is essentially shut down because of low oil prices. That's put a LOT of white and yellow band drill pipe on the local market for as little as $26 for a 31' joint. Yellow band pipe is still 85% or more of it's original thickness so it'll take a LONG time to rust out.

That said, I hear what you're saying and with orange or red band, it is definitely a serious concern. I'm not saying I disagree with you, I'm just thinking on the keyboard.

I never heard of the color band rating for drill stem pipe. I'm seeing 2 3/8s pipe for $20 a joint and 2 7/8s for $30 a joint with 4 1/2 going for $2.50 a foot. None of the ads I've saved mention a color of any kind. I'm wanting it for an 8 foot deer fence around my land and while I want to save money, I also want to do it once and move on to other things.

What are all the colors and what do they mean?
 
   / Building a covered work area with a 40' span, will this work?
  • Thread Starter
#52  
   / Building a covered work area with a 40' span, will this work? #53  
Thank you!!!
 

Tractor & Equipment Auctions

2004 Bush Hog 306 72in. Commercial Mower Attachment (A49346)
2004 Bush Hog 306...
2003 MACK RD6885S T/A DUMP TRUCK (A51406)
2003 MACK RD6885S...
2001 Big Tex 10PI 16ft. T/A Pipe Top Utility Trailer (A49461)
2001 Big Tex 10PI...
2006 Ford F-550 4x4 Flatbed Pickup Truck (A50323)
2006 Ford F-550...
3000 Gallon Black Poly Water Tank (A49461)
3000 Gallon Black...
2021 Spartan SRT-XD Zero Turn Mower (A50860)
2021 Spartan...
 
Top