Building a covered work area with a 40' span, will this work?

   / Building a covered work area with a 40' span, will this work? #51  
The main reason for the availability right now is that the oil patch in South Texas is essentially shut down because of low oil prices. That's put a LOT of white and yellow band drill pipe on the local market for as little as $26 for a 31' joint. Yellow band pipe is still 85% or more of it's original thickness so it'll take a LONG time to rust out.

That said, I hear what you're saying and with orange or red band, it is definitely a serious concern. I'm not saying I disagree with you, I'm just thinking on the keyboard.

I never heard of the color band rating for drill stem pipe. I'm seeing 2 3/8s pipe for $20 a joint and 2 7/8s for $30 a joint with 4 1/2 going for $2.50 a foot. None of the ads I've saved mention a color of any kind. I'm wanting it for an 8 foot deer fence around my land and while I want to save money, I also want to do it once and move on to other things.

What are all the colors and what do they mean?
 
   / Building a covered work area with a 40' span, will this work?
  • Thread Starter
#52  
   / Building a covered work area with a 40' span, will this work? #53  
Thank you!!!
 

Tractor & Equipment Auctions

2018 MACK GU813 DUMP TRUCK (A59823)
2018 MACK GU813...
2023 Fat Truck 2.8C Amphibious AWD Off-Road Utility Vehicle (A55852)
2023 Fat Truck...
New/Unused CFG Industrial QK16R Mini Excavator (A57453)
New/Unused CFG...
40ft High Cube Shipping Container (A57453)
40ft High Cube...
New/Unused Self Dumping Hopper (A57454)
New/Unused Self...
1989 Ford LT9000 Log Truck, VIN # 1FDZU90T2KVA25137 (A57453)
1989 Ford LT9000...
 
Top