PJ -
Congratulations - I am impressed. Looks like a very professionally-done job.
I was a lot like you. Picked up the PT425 right before the 4th of July, and ended up spending about 27-28 hours on it in the 3 day weekend, moving bark dust, brush hogging, etc. What a terrific machine.
I also have some steep slopes on my property. I found the lug tires to be essential. In fact, after mowing today, I find it is also essential on damp grass, especially when I'm on the steeper parts.
I thought the 4-in-1 would be good for picking up rocks. Did you use it for that?
Do you feel the 4-in-1 would be useful in some other ways? I figured it was mostly for things like picking up logs, etc. I wasn't sure if it was useful for just dirt. What's your take?
So, did you already do three maintenances?
-Rob /forums/images/graemlins/grin.gif