So I got a good deal on some trusses...

   / So I got a good deal on some trusses...
  • Thread Starter
#101  
Here's what one 7 yard load looks like on the ground. They could have brought in more per truck, but kept it to only 7 yards per load to prevent possible damage to the 600' driveway.
 

Attachments

  • 679885-CIMG3114_0003.jpg
    679885-CIMG3114_0003.jpg
    70.4 KB · Views: 436
   / So I got a good deal on some trusses...
  • Thread Starter
#102  
When the second truck pulled away they started the screed process using a long piece of aluminum box channel.
 

Attachments

  • 679886-CIMG3115_0003.jpg
    679886-CIMG3115_0003.jpg
    62.6 KB · Views: 399
   / So I got a good deal on some trusses...
  • Thread Starter
#103  
They worked very well as a team and moved along a lot faster than I expected. They were careful to check for the rebar height reference mentioned earlier. Total pitch from back to front of slab is 1-1/2".
 

Attachments

  • 679889-CIMG3116_0003.jpg
    679889-CIMG3116_0003.jpg
    58.9 KB · Views: 374
   / So I got a good deal on some trusses...
  • Thread Starter
#104  
By the time one truck was hosed down clean and the next truck backed in, they were ready.
 

Attachments

  • 679890-CIMG3117_0003.jpg
    679890-CIMG3117_0003.jpg
    69.5 KB · Views: 370
   / So I got a good deal on some trusses...
  • Thread Starter
#105  
Working around the thickened footer edge they constantly banged the forms with hammers, etc., to settle the concrete and get a nice smooth side on the slab with minimal air voids.
 

Attachments

  • 679892-CIMG3118_0003.jpg
    679892-CIMG3118_0003.jpg
    66.6 KB · Views: 372
   / So I got a good deal on some trusses...
  • Thread Starter
#106  
Adam was the 'edge guy'. He went around and really worked the edges, putting a nice smooth ease on them.
 

Attachments

  • 679896-CIMG3121_0003.jpg
    679896-CIMG3121_0003.jpg
    41.6 KB · Views: 400
   / So I got a good deal on some trusses...
  • Thread Starter
#107  
Decided to modify our slab design at the side overhead door. Originally, I was going to just hold the apron height to the top of the lowered 5/4" PT board break. The head mason suggested 'cutting in' to the slab as pictured for even better water control. I like it.
 

Attachments

  • 679898-CIMG3122_0003.jpg
    679898-CIMG3122_0003.jpg
    38 KB · Views: 431
   / So I got a good deal on some trusses...
  • Thread Starter
#108  
Here's the front apron framing before the wire and rebar. It ended up being a bit bigger than originally estimated and a whole lot thicker.
 

Attachments

  • 679900-CIMG3105_0003.jpg
    679900-CIMG3105_0003.jpg
    75.8 KB · Views: 410
   / So I got a good deal on some trusses...
  • Thread Starter
#109  
In fact, it ended up being just about 1 yard larger than originally estimated. I know this because, after dumping 21 yards, they were 1 yard short! #%@!*&%!
 

Attachments

  • 679902-CIMG3120_0003.jpg
    679902-CIMG3120_0003.jpg
    54.3 KB · Views: 374
   / So I got a good deal on some trusses...
  • Thread Starter
#110  
While waiting for the fourth truck, they started working the power float.
 

Attachments

  • 679911-CIMG3126_0003.jpg
    679911-CIMG3126_0003.jpg
    61.9 KB · Views: 443

Tractor & Equipment Auctions

2014 DIAMOND C TRAILER MFG. (A50322)
2014 DIAMOND C...
(9) 8' Treated Posts (A50515)
(9) 8' Treated...
2013 Ford F-550 Ambulance (A50323)
2013 Ford F-550...
2006 GMC C8500 Altec AM547 50ft Material Handling Insulated Bucket Truck (A50323)
2006 GMC C8500...
Towable Orchard Sprayer (A51691)
Towable Orchard...
2010 Ford Edge SE SUV (A51694)
2010 Ford Edge SE...
 
Top