Timber Frame Build - Round 2

   / Timber Frame Build - Round 2
  • Thread Starter
#91  
Thanks everyone. The contractor we used is by far the best in our area. They do a lot of really nice concrete overlays as well to refurbish old concrete.
 
   / Timber Frame Build - Round 2
  • Thread Starter
#92  
Ready for the next pour. Around 20 yards of concrete getting poured tomorrow. After that they will form a step coming off this area and bring some dirt in for finish grade around the concrete.

2017-10-16_05-18-30
 
   / Timber Frame Build - Round 2
  • Thread Starter
#94  
The remainder of the concrete is finished. Finish grade is done as well and even though its a little late I went ahead and got some grass seed down today and covered with straw mat. Next I need to work on sound for the wedding area and string some cable for some string lights I plan to install.

2017-10-19_06-28-44

2017-10-19_12-12-30

2017-10-19_06-29-53
 
   / Timber Frame Build - Round 2 #95  
That turned out great. Huge investment, but it's going to make your place one of a kind!!!
 
   / Timber Frame Build - Round 2
  • Thread Starter
#96  
Thanks Eddie. My Landscape contractor showed back up today to do the curbing around the wedding area. I've never seen a concrete curb machine in action until today. Their machine had a hopper they fed with a plunger that forced the mix out of the bottom mold and pushed the machine slowly along as it was laid. There were adjustments on the machine for tilt to keep it level as well. Right now the coloring looks red but they promised it will be a brown/tan color similar to the stonework after it's washed off. Crossing my fingers.

2017-10-20_08-59-02

2017-10-20_08-58-45

2017-10-20_08-59-40
 
   / Timber Frame Build - Round 2 #97  
Like your home and other property, it is first class and quite impressive.
 
   / Timber Frame Build - Round 2 #98  
I've never seen that done before either. Looks pretty simple, but also, labor intensive!!!
 
   / Timber Frame Build - Round 2
  • Thread Starter
#99  
I've never seen that done before either. Looks pretty simple, but also, labor intensive!!!

It was labor intensive based on the short time watching them work. Unfortunately this may be my first setback. Color still looks very red and clashes with everything else after washing it off. May have to be tore out if it cant be fixed.
 

Tractor & Equipment Auctions

12.7 LITER DETROIT GENERATOR SKID (A50854)
12.7 LITER DETROIT...
2016 Ver-Mac S/A Towable Trailer Message Board (A49461)
2016 Ver-Mac S/A...
Lincoln Electric Vantage 300 Welder/Generator (A49461)
Lincoln Electric...
30ft Pole S/A Towable Trailer (A49346)
30ft Pole S/A...
Mk Diamond MK-101 Wet Tile Saw (A49461)
Mk Diamond MK-101...
2013 Case IH Magnum 315 MFWD Tractor (A50657)
2013 Case IH...
 
Top