Now I'm confused. Why the separate forms for the posts?
 
   / Timber Frame Build - Round 2
  • Thread Starter
#82  
Now I'm confused. Why the separate forms for the posts?

Post forms with footings were poured yesterday separate from the main slab so that the slab can move independent of the footings. The post locations will have an expansion joint around them.
 
   / Timber Frame Build - Round 2 #83  
I do that so I can make the concrete base higher then the surrounding concrete to help keep the bottoms of my posts as dry as possible. I didn't know there was any movement that would require the base to be isolated from the slab. Is that code or required from an engineer?
 
   / Timber Frame Build - Round 2
  • Thread Starter
#84  
I do that so I can make the concrete base higher then the surrounding concrete to help keep the bottoms of my posts as dry as possible. I didn't know there was any movement that would require the base to be isolated from the slab. Is that code or required from an engineer?

Our pads will be flush with the concrete. The larger pads will get a riser post in the center for the timbers to sit on then concrete block around it to build up a stone column. The smaller pads will get a post plate for the posts to sit on that will keep them a 1/2" or so off the concrete. Not sure if it's code or not (we have no code to follow here in the county outside of city limits) however it's good practice in my area of NW Missouri due to potential for frost heave. If the slab was not independent of the footings frost heave would cause the slab to crack around the footings because it couldn't float independently.

2017-10-11_09-41-07
 
   / Timber Frame Build - Round 2
  • Thread Starter
#86  
Sealer is down on the first section. Footings for 2nd section are getting poured tomorrow then the next section of flatwork will be poured on Tuesday.

2017-10-12_05-09-35

2017-10-12_07-40-39
 
   / Timber Frame Build - Round 2 #87  
BEAUTIFUL!!!!! Really a nice job on that concrete. It's night and day better.

I'm getting more and more excited to see how you are going to do your porch and finish off the building.
 
   / Timber Frame Build - Round 2 #88  
It does look great. Always wanted to do a stamped walkway or patio.
 
   / Timber Frame Build - Round 2 #89  
:thumbsup: That concrete work is BEAUTIFUL!!!
 
   / Timber Frame Build - Round 2 #90  
SUPER NICE!!

These are the kind of pics I can't show to Sweetie or we'll be ripping out our sidewalks and driveway.... LOL!
 

Tractor & Equipment Auctions

UNUSED WOLVERINE TQH-26-01C 3 PT QUICK HITCH (A57193)
UNUSED WOLVERINE...
2017 Nissan Titan (A55788)
2017 Nissan Titan...
2018 FREIGHTLINER CASCADIA 126 SLEEPER (A57880)
2018 FREIGHTLINER...
2009 MULTIQUIP 25KW GENERATOR (A53843)
2009 MULTIQUIP...
2020 Kubota SVL75-2 (A53317)
2020 Kubota...
4 Unused Montreal ST205/75R15 Trailer Tires (A55788)
4 Unused Montreal...
 
Top