New workshop/garage

   / New workshop/garage
  • Thread Starter
#31  
Nov 8. Spent morning & into afternoon installing purlins for the roofing panels.

Looking back on all these photos, I'm sorry I did not set a specific spot & take all the pictures from there. But I'm jumping from place to place like a kid on Christmas morning. The crew doing all the work have been pretty tolerant of me, thank goodness.
 

Attachments

  • 526567-Install purlins.jpg
    526567-Install purlins.jpg
    89.6 KB · Views: 368
   / New workshop/garage
  • Thread Starter
#32  
Nov 8. Start installing metal roofing about 3 PM.
 

Attachments

  • 526571-Start Metal Roofing.jpg
    526571-Start Metal Roofing.jpg
    84.8 KB · Views: 339
   / New workshop/garage
  • Thread Starter
#33  
One more shot of start of roofing - - this one a little further away.
 

Attachments

  • 526573-View from pasture.jpg
    526573-View from pasture.jpg
    80.8 KB · Views: 318
   / New workshop/garage
  • Thread Starter
#34  
Nov 10 8 AM. Roof almost finished.
 

Attachments

  • 527719-Nov 10 - 8 AM  Roof almost finished..jpg
    527719-Nov 10 - 8 AM Roof almost finished..jpg
    80 KB · Views: 323
   / New workshop/garage
  • Thread Starter
#35  
Nov 10 3 PM. Roof finished. Just in time - - started to rain within the hour.
 

Attachments

  • 527721-Nov 10 - 3 PM  Finished Roof jpg.jpg
    527721-Nov 10 - 3 PM Finished Roof jpg.jpg
    68.8 KB · Views: 369
   / New workshop/garage #36  
Looking better everyday. Looks like things are going pretty smooth on this project. Before you know it, you'll be in there waxing that tractor /forums/images/graemlins/grin.gif. Gerard
 
   / New workshop/garage
  • Thread Starter
#37  
Nov 11. Started and finished siding. This crew works together exttemely well. They have 1 or 2 guys on ladders, as needed, & a 3rd cutting & fetching for them. Using air framers, the siding went on quickly.
 

Attachments

  • 528830-Start siding.jpg
    528830-Start siding.jpg
    72.8 KB · Views: 333
   / New workshop/garage
  • Thread Starter
#38  
Nov 11, end of day - - Siding is complete.
 

Attachments

  • 528832-Siding complete.jpg
    528832-Siding complete.jpg
    65.4 KB · Views: 312
   / New workshop/garage
  • Thread Starter
#39  
Nov 12. Today the crew worked a half day. They spent most of their time putting up 1x4" trim around the edges & corners.

After they left to start their weekend, I moved the BX into its new digs for its 1st overnight visit. Looks like I should have bought a bigger tractor.
 

Attachments

  • 528834-1st overnight visit.jpg
    528834-1st overnight visit.jpg
    49.9 KB · Views: 379
   / New workshop/garage #40  
</font><font color="blue" class="small">( Looks like I should have bought a bigger tractor. )</font>

Yes, it kind of looks like a little mouse sitting in there, but you will fill the space in around it, no doubt.

Cliff
 

Tractor & Equipment Auctions

198921 (A51243)
198921 (A51243)
2023 CATERPILLAR 299D3 XE SKID STEER (A51242)
2023 CATERPILLAR...
KNOW BEFORE YOU BID - DO YOUR HOMEWORK AND BE HAPPY WITH YOUR PURCHASE (A51243)
KNOW BEFORE YOU...
2014 Ford F250 Service Truck (A50323)
2014 Ford F250...
2014 Peterbilt 384 T/A Day Cab Truck Tractor (A51692)
2014 Peterbilt 384...
1985 International X Con Semi (A50514)
1985 International...
 
Top