New workshop/garage

   / New workshop/garage
  • Thread Starter
#11  
Bring in concrete crew & pour slab.
 

Attachments

  • 521620-Pour slab.JPG
    521620-Pour slab.JPG
    35.2 KB · Views: 531
   / New workshop/garage
  • Thread Starter
#12  
Finished slab, Sept 28.

You can tell I'm not building this myself - - I've got time to take pictures.
 

Attachments

  • 521622-Finished Slab.JPG
    521622-Finished Slab.JPG
    48.5 KB · Views: 627
   / New workshop/garage #13  
Looks great so far Tdog! How much have you done this month?
 
   / New workshop/garage #14  
Lookin' real good so far. Keep up the pics. It is fun to watch the jobs progress. /forums/images/graemlins/smile.gif Wish I had a floor in mine already /forums/images/graemlins/frown.gif
 
   / New workshop/garage
  • Thread Starter
#15  
How much have you done this month?

Glenn, your question got me to looking at what I had posted. There was a slight operator error [me] - - sometimes I'm calendar impaired. I think it was my 5th post where I said the next 3 photos were made on Sept 26 - - well shoot, that's wrong. It would be hard to stake out the corners, smooth the surface & drill the holes before the loads of clay were delivered. I meant to say those next 3 photos were all from Oct. 26.
Bottom line is that real constuction began Oct. 26. Once they started they made great progess.
A load of lumber was delivered yesterday. The contractor should be back tomorrow - - although a cool front is supposed to come through & bring some [badly needed] rain.
 
   / New workshop/garage
  • Thread Starter
#16  
Nov 1. Started installing double girders along the walls that will hold the trusses.
 

Attachments

  • 524013-Begin girders.JPG
    524013-Begin girders.JPG
    51.8 KB · Views: 510
   / New workshop/garage
  • Thread Starter
#17  
Girder close up. This shows the opening [14'] for sliding doors.
 

Attachments

  • 524017-Girder close up.JPG
    524017-Girder close up.JPG
    46.3 KB · Views: 433
   / New workshop/garage
  • Thread Starter
#18  
Girder close-er up of edge of door.
 

Attachments

  • 524019-Girder close-er up.JPG
    524019-Girder close-er up.JPG
    34.2 KB · Views: 365
   / New workshop/garage
  • Thread Starter
#19  
Nov 2. Started truss construction. Made pretty good progress till the rains came. Since work stopped, we've received almost 3.5" of rain. I assume work will begin again tomorrow. With the passage of the cool front I don't know if you'll see many more guys working sans shirts.
 

Attachments

  • 524022-Build trusses.JPG
    524022-Build trusses.JPG
    18.9 KB · Views: 487
   / New workshop/garage #20  
Building is a lot of fun mixed with frustration.

I love doing it as a part time hobbie.

Nice looking shop. Have fun with it.

Dane
 

Tractor & Equipment Auctions

Year: 2012 Make: Ford Model: Fusion Vehicle Type: Passenger Car Mileage: 61,276 Plate: Body Type: 4 (A50324)
Year: 2012 Make...
2010 Ford Edge SE SUV (A51694)
2010 Ford Edge SE...
2011 Volvo Semi Truck (NOT RUNNING) (A50774)
2011 Volvo Semi...
2010 Ford Edge SE SUV (A51694)
2010 Ford Edge SE...
2015 Ram 3500 4x4 Crew Cab Pickup Truck (A50323)
2015 Ram 3500 4x4...
2014 Ram 1500 Pick Up (A47384)
2014 Ram 1500 Pick...
 
Top